Oracle On-Site Gas Turbines (Abilene TX)

On-site Generation (Siemens / GE) → Oracle / OpenAI · Aug 1, 2024

Operational gas turbine
Capacity
300 MW

Overview

Oracle installs on-site gas turbine generators at Abilene Stargate campus for immediate power while grid upgrades are completed. 300MW of behind-the-meter generation.

Deal NameOracle On-Site Gas Turbines (Abilene TX)
UtilityOn-site Generation (Siemens / GE)
CustomerOracle / OpenAI
Capacity300 MW
Typegas turbine
StatusOperational
DateAug 1, 2024

Source

https://www.oracle.com

Related Datacenters

Stargate Abilene Campus
Oracle / OpenAI / SoftBank · Abilene, Texas, USA
Phase 1 Operational 300 MW